Great Barrington Select Board Recommends Truss Design for State Road Bridge Replacement
Select Board · Meeting of July 6, 2026
LENOX — Great Barrington Select Board votes 4-1 to recommend truss-style design for State Road Bridge and defers hotel permit dispute to July 27. The board backed Alternative Two, a truss design paying homage to the existing red bridge at Routes 7 and 23, over a stone-clad alternative, following a MassDOT Zoom presentation on July 1 that Town Manager Chris Rembold credited to strong turnout at a November 2025 public hearing. A public comment portal is live on the town DPW website through at least the end of the week.
On the stalled 79 Bridge Street hotel, attorney Kathleen McCormick, representing applicants VJ and Crystal Mahita, asked the board to allow her to confer with town counsel before any show cause hearing on a possible special permit lapse, telling the board that a facade-preservation requirement had added "more than a million dollars of cost" and years of delay to the project; the board voted unanimously to continue the matter to July 27.
In the full story:
- Note on Jurisdiction
- Town Manager's Report and Conflict-of-Interest Disclosure
- Driveway Permit — 172 Division Street
- Board and Committee Appointments
- Complaint Against Library Trustee — Ground Rules
- State Road Bridge Design — MassDOT Alternative Selection
- The complete report — 3,061 words
Source: the Select Board meeting of July 6, 2026, reported from the official video recording and transcript.
Keep reading with a 14-day free trial
Subscribe to Berkshire County News to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news